Located beneath both the Brooklyn and Queens side of the Kosciuszko Bridge, this project involved the installation of 30-foot timber piles, drainage pipe (ranging from 12 inches to 24 inches), manholes and catch basins. A pile driving hammer was utilized to drive the piles to the correct elevations; while trench boxes were used for supporting the excavation process when digging to install the drainage pipes. Proud partnership as a subcontractor along side Granite Construction as the General Contractor for: Replacement of Kosciuszko Bridge over Newtown Creek, Phase 2 , I-278, Brooklyn-Queens Expwy.